Technical review
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
Share the drawings and information already available. We will separate what is ready for manufacture from what still needs a decision, measurement or site check.
Send us the available documentation, location, units and target date
The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We adjust construction solutions, thicknesses, machining and hardware to the intended use
Manufacturing according to documentation and finishes validated before starting
We plan delivery, access, fitting, adjustments and review of installed parts
The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.
We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail
We integrate the custom carpentry into the renovation schedule and review the conditions before fitting
We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope
We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.
We study commercial furniture that combines display, storage, brand image and real conditions of the premises
We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.
Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label
Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.
Plans, measurements, units, finishes, location and planned schedule
Technical queries, exclusions, alternatives and outstanding information
Final measurements, samples, hardware, details and fitting conditions
Manufacture, control, delivery, installation and agreed adjustments
It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue
What parts should be manufactured and if there are repeated typologies
Plan, elevations, details or approximate dimensions for a first review
Prescribed finishes or visual references to propose a viable equivalence
town or area, access routes, phase of work and target installation date
The final scope is confirmed after reviewing the documentation and actual project conditions
Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope
Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.
Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions
Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions
No two addresses present the same combination of walls, light, access and daily routines. These are the conversations that make a professional furniture package specific to the property rather than a variation on a standard product.
We would rather receive three clear facts than a long wish list copied from a catalogue. The first review looks at the information already resolved, the decisions still open and the point at which the site will be ready, then narrows the scope.
If several people use the room, we record the disagreement as well as the shared priorities. It is better to resolve that tension in the layout than during fitting.
Approximate measurements help us judge scale. Production dimensions are different: they are taken at the points that control doors, fillers, worktops, services and the route into the room.
We distinguish a dimension used to explore an idea from one released to the workshop. That small discipline prevents an early estimate from quietly becoming a production instruction.
The project manager filters the options before presenting them. You see credible alternatives with an explanation of what changes in feel, upkeep and price—not a catalogue without context.
If two options are genuinely equivalent for the brief, we say so. Material advice should reduce uncertainty, not invent distinctions to justify a longer specification.
Floor level, lift size, stairs, parking and tight turns are checked before module sizes are approved. Dividing a piece well is a design decision; discovering the need at delivery is not.
Scribes and final adjustments are allowed for rather than treated as surprises. That is how a fitted piece meets the building without looking forced.
Phasing can be sensible, particularly when several rooms are involved. What matters is deciding the sequence before one early choice limits a later room.
For a professional furniture package, we can identify the decision that drives most of the cost and explain it before smaller choices distract from the total.
After reviewing the information, we tell you what is viable, what is still uncertain and whether a measured visit is the right next step. There is no need to stage the room before sending photographs.
Before production, the confirmed information is brought together. Scattered messages are useful during discussion, but the workshop works from one current set of decisions.
Share plans, units, location and target date. We will tell you the next step